Posts

how to design battery pack

Image
  Mechanical modelling and design of lithium ion battery packs Bold uses CAD to accurately model the battery system in combination with the electrical modelling of the battery system. We work with Catia v5 and Fusion 360 depending on the requirements of the project.  Design is done concurrently between electrical design and mechanical design. There is also a focus on material selection to achieve the electrical performance specifications, especially in bolted mechanical joints and welded joints. We have an extensive material and surface coating library of specifications for different levels of performance that cover most markets. On this front, we work with specialist suppliers to achieve the quality and reliability expected. Further information about testing and mechanical design of battery packs will be added in our article area in the website in the nearby future.

charger-circuit

Image

Costs for Setting Up EV Charging Stations

Image
  Cost of Setting Up EV Charging Stations The cost of setting up an EV charging station consists of two types of costs: Infrastructural Costs Charger Costs Infrastructural Costs for Setting Up EV Charging Stations The infrastructural costs consist of facilities, equipment, and land required for the charging station. The cost break-up for the same is given below: Requirement Cost Land Lease at INR 50,000 per month Rs. 6,00,000 Electricity connection, transformers, and energy meters Rs. 7,50,000 Civil Works Rs. 2,50,000 Maintenance and Technical team Rs. 3,00,000 Brand promotion and Marketing Rs. 50,000 Total Rs. 19,50,000 Please Note: The mentioned above are estimated. They may differ according to time and place. Charger Costs As per the government guidelines, public EV charging stations must have at least three fast (DC) chargers and two slow (AC) chargers. The cost of Level 1 chargers is comparatively low as compared to Level 2 and 3 chargers. The cost of different charger...

Post 4